Some pictures of existing units

Some pictures of the existing building and units

SE Side of Building

Building front after completion

Interior including stair

Interior of unit with optional mezzanine

Interior from Mezzanine

View from optional mezzanine

Interior from floor

Interior of unit looking out – new units will have cement block to beams.

Interior direct on

Looking into a unit with the optional mezzanine

Work is progressing well. Phase 2 is mostly enclosed!

The structure is in place!

IMG_0354[1]

Interior with roof membrane

DSC00907

DSC00908

DSC00909

Demising wall foundations, plumbing and conduit are going in.

IMG_0390[1]

IMG_0397[1]

Sheathing being applied.

DSC00890