The North Lot is close to ready for paving.

We can’t wait for the work to be completed!

DSC02243

The lot is being graded to receive the asphalt soon.

DSC02245
Unit 32 is being readied with its stair and mezzanine coming into place.
DSC02249
Subsurface drainage for the parking lot and roadway is in place.
DSC02250 copy
Soon the asphalt will be integrated into the driveway and parking with Phase 1.