We are offering for sale our rights to Build Phase 3

355 and 345 Compass Circle have been constructed and all 32 units have sold!

335 Compass Circle is un-built and available for sale.  We are selling our rights to construct a 6,000 sqft footprint building that will be part of the West Davisville Small Business Center.

We had planned to put up a two-story building with office and industrial space there.  We had planned on 5 or 6 Units.  Those plans were approved by the EDC, but our plans have changed.

Over the years we have had people interested in Phase 3, both in buying units or, in some cases, building a special purpose building on the footprint.  There is sufficient parking to meet what was our planned use.

If you are interested, please contact Rick Grosvenor.

Open House, Dec. 3rd, from 12:30-3:00pm, our units are ready for their new owners!

Open House, December 3rd, from 12:30-3:00 pm!! We have our Certificate of Occupancy!  Call ahead and come by for a visit to see the new spaces!


 We’re holding an open house on Saturday, December 3rd from 12:30 to 3:00 pm.  Come by and take a look!!

Unit 32 and 17 have the mezzanines installed!

unit-32-from-entrance
Unit 32’s stairs and mezzanine are in! You can see the lavette and, to the side, the shop sink which are tucked under the stairs.
unit-332-looking-up-stairs
Another view of the stairs showing the treads, which are made of nicely finished hard pine.
unit-32-window
Here is a view of 32’s mezzanine, which, being an end unit, also enjoys a window.
mezz-shot-unit-32
You can see Unit 32’s lighting as well as enjoy the view from the mezzanine. The gas heater is in place as well as the sprinklers, which are in all the units.
unit-17-with-mezz
Unit 17 has its bath sunk into the back wall. The mezzanine makes up the extra square footage so that the unit has 1,500 total square feet.

 

Units should be completed with C of O’s in the week of September 26!!

Apricot colored trumpet vine on the stone wall behind the property.
Apricot colored trumpet vine on the stone wall behind the property.
North Side Units
The north side of the building across from the trumpet vine.
Interior with bath framed
The lavette is being framed and readied for completion. Each unit has a private bath and shop sink, electric overhead door, shop sink, 3-phase electric and is fully sprinkled for fire safety.
Unit in process
The lifts are in to be able to put the finishes in place!
Unit looking towards door
Looking out from inside the unit.

 

We’re closing out the pre-construction pricing; we are nearing completion!

Interior with mezzanine framework in and stairs being installed.
Interior with mezzanine framework in and stairs being installed.
SE Corner where work is finishing up.
SE Corner where work is finishing up.
South Side of the project with the doors installed.
South Side of the project with the doors installed.
The north side, looking down the buildings.
The north side, looking down the buildings.
Reserved units are indicated in red, but there are still a number of units, including end units still available. Our pre-construction pricing will be coming to an end as the building reaches completion.
Reserved units are indicated in red, but there are still a number of spaces, including end units, available. Our pre-construction pricing will be coming to an end as the building reaches completion.

The North Lot is close to ready for paving.

We can’t wait for the work to be completed!

DSC02243

The lot is being graded to receive the asphalt soon.

DSC02245
Unit 32 is being readied with its stair and mezzanine coming into place.
DSC02249
Subsurface drainage for the parking lot and roadway is in place.
DSC02250 copy
Soon the asphalt will be integrated into the driveway and parking with Phase 1.

Readying for the blacktop

Progress on the units is going along on schedule as the drainage piping has been laid and the gravel is being leveled to receive the blacktop!

DSC02013r
View across the new units to the old.
DSC02012r
We have a buyer who has customized his unit…you can see through the combined units.
DSC02011a
A front -on look at the new units. We are looking to have half the units sold soon, so, if you’re interested please let us know. We still have a couple of end units!